Now showing items 1-3 of 3

    • Abordagens para resolver o problema integrado de dimensionamento de lotes e scheduling em máquinas paralelas 

      Carvalho, Desiree Maldonado [UNIFESP] (Universidade Federal de São Paulo (UNIFESP), 2019-02-25)
      This study approaches the integrated lot sizing and scheduling problem (ILSSP), in which non-identical machines work in parallel with sequence-dependent non-triangular (NT) setup costs and times, setup carr y-over and ...

    • Hybrid method with CS and BRKGA applied to the minimization of tool switches problem 

      Chaves, A. A. [UNIFESP]; Lorena, L. A. N.; Senne, E. L. F.; Resende, M. G. C. (Pergamon-Elsevier Science Ltd, 2016)
      The minimization of tool switches problem (MTSP) seeks a sequence to process a set of jobs so that the number of tool switches required is minimized. The MTSP is well known to be NP-hard. This paper presents a new hybrid ...

    • Uma nova heurística para o problema de minimização de trocas de ferramentas 

      Chaves, Antonio Augusto [UNIFESP]; Senne, Edson Luiz França; Yanasse, Horacio Hideki [UNIFESP] (Universidade Federal de São Carlos, 2012-01-01)
      The minimization of tool switches problem (MTSP) seeks a sequence to process a set of jobs so that the number of tool switches required is minimized. This study presents a new heuristic for the MTSP. This heuristic has two ...